CHUTE WASHING PROCEDURES

Services >> Chute Washing >> Chute Washing Procedures


EVALUATION
A floor-to-floor evaluation and visual inspection will be performed to identify any repairs that may he needed to bring the trash chute system into regulatory compliance. If the visual inspection reveals damage to the trash chute system, pictures will be taken and provided to management. After review by a CHUTES representative a proposal will be submitted for making the necessary repairs and cleaning the trash chute system.

CLEANING PROCEDURE
Upon acceptance of the proposal, CHUTES International agrees that scheduling will commence and the following shall apply:

A: It is the responsibility of the Owner or the Building Management to inform residents of schedule dates and precautionary procedures. (We highly recommend posting notification at each chute door location.)

B. The trash chute system and compactors will he saturated with an E.P.A. Registered quaternary chemical which kills the biological contaminants. A minimum ten minute dwell time is necessary.

C. The trash chute system will be saturated with a highly concentrated degreaser.

D. After degreasing, the trash chute system will receive a final rinse with an E.P.A. quaternary chemical which is left to dry on the surface. This also acts as a deodorizing wash.

E. The compactor room will be cleaned of all refuse as a result of the cleaning process and will be deodorized and sanitized. All areas in which we work will be left in a clean and orderly condition(does not apply to preexisting conditions).

F. All material is guaranteed to be as specified. All work is to be completed in a professional manner according to standard practices. Any alteration or deviation from the above specifications involving extra costs will be executed only upon written order, and will become an extra charge over and above the estimate. All agreements are contingent upon accidents, acts of God, or delays beyond our control.

G. Complimentary 1 ltr. bottle of Biostreme 111 F.

 

   
 
   
     
   
     
 
 
 